  • Silica Reduction in Secondary Ammonia Refromers

    2017-10-8 · SILICA REDUCTION IN SECONDARY REFORMERS Hydrogen produced in the primary reformer at 1800°F (980 °C) passes through a transfer line to the secondary reformer where it is mixed with steam at about 2450 °F (1340 °C), passes through a catalyst bed and exits to a waste heat boiler at 1800°F (980 °C). From there it passes through

    Get a quote
  • Process Gas Waste Heat Boilers - FBM Hudson Italiana

    FBM Hudson Italiana delivered its first Ammonia Reformed Gas Waste Heat Boiler in the late '60 and since then has strived to expand and improve design capabilities and manufacturing range. In 1998 FBM Hudson Italiana further increased the product competence by acquiring the technology of Babcock Entreprise S.A.of which became the successor.

    Get a quote
  • Failure of Waste Heat Boiler Downstream of …

    Search this site Search this site. Contact & Service. Contact. Contact form; Contact persons; Sites and opening hours

    Get a quote
  • secondary waste heat boiler - animalhealingtrust.org.uk

    the use of waste heat boiler after secondary reformer in nh3 production the use of waste heat boiler after secondary reformer in nh3 production Thinking Outside the Box: A Misguided Idea With all due respect, Professor Boyd . Get a Quote. Process Gas Waste Heat Boilers - FBM Hudson Italiana.

    Get a quote
  • (PDF) Theory and Operation of Secondary - …

    Theory and Operation of Secondary Reformers By: Gerard B. Hawkins Managing Direct or, CEO Introduction Purpose Key t o good perform ance Problem Areas • Cat alyst s, heat shields and plant up- rat es • Burner Guns Developm ent of High I nt ensit y Ring Burner Case St udies Conclusions Secondary Reformer Purpose Reduce m et hane slip t o very low levels • Around 0.3- 0.5 % m ol dry For am

    Get a quote
  • Heat Exchanger Reformer Industrial Efficiency …

    The reformer exchanger uses high temperature process heat exiting the secondary reformer (or exiting an auto-thermal reformer) to produce syngas by reforming an additional flow of natural gas and steam. In this way additional reforming capacity is realized by utilizing heat available in the existing unit that was previously used for steam generation.

    Get a quote
  • (PDF) Secondary Reformer Refractory Dry Out Operation

    PDF Secondary reformer refractory baking and dry out cycle requires very slow and controlled heating of refractory. Thermal stresses will be produced if heating rate is too rapid. Longer period

    Get a quote
  • Second failure of reformed gas waste heat boiler …

    2019-7-31 · After the feed gas and process steam was stopped to Primary Reformer and also process air stopped to Secondary Reformer, the acid header vent was still venting a lot of saturated steam from the gas stream side. Therefore, it might be concluded that the Reformed Gas Waste Heat Boiler 1-E …

    Get a quote
  • waste heat boiler and secondary reformer compare …

    2019-1-21 · waste heat boiler and secondary reformer compare prices. the of and to a in that is was he for it with as his on be at Most Common Text: Click on the icon to return to and to enjoy and benefit . the of and to a in that is was he for it with as his on be at by i this had not are but from or have an they which one you were all her she there

    Get a quote
  • secondary waste heat boiler - animalhealingtrust.org.uk

    the use of waste heat boiler after secondary reformer in nh3 production the use of waste heat boiler after secondary reformer in nh3 production Thinking Outside the Box: A Misguided Idea With all due respect, Professor Boyd . Get a Quote. Process Gas Waste Heat Boilers - FBM Hudson Italiana.

    Get a quote
  • ,converter waste heat boiler,,,

    2018-10-1 · This paper judges the process side leakage of reformer waste heat boiler(WHB)of Jinxi ammonia plant during its operation,analyzes leakage reasons,proposes attentions to

    Get a quote
  • Fire in secondary reformer outlet line to waste heat …

    Fire in secondary reformer outlet line to waste heat boiler Fire in secondary reformer outlet line to waste heat boiler Singh, Jagmohan; Basu, P.; Rao, B. M. 2002-09-01 00:00:00 This paper describes the failure of the pressure shell of an interconnecting pipe between the secondary reformer and primary waste heat boiler that led to a fire in Ammonia Unit I after 13‐and‐a‐half years of

    Get a quote
  • Waste Heat Boiler (Syngas) Boilers Products …

    2019-8-10 · The process gas waste heat boiler (WHB) is a critical piece of equipment cooling the hot synthesis gas exiting an ATR, a secondary reformer, or an SMR. The heat from the process gas is utilized to generate high pressure and high-quality steam for the process and to drive turbines.

    Get a quote
  • Problem, Failure and Safety Analysis of Ammonia Plant: a

    2011-1-17 · Reformer tube can also fail by stress corrosion cracking. During welding, the steel in the heat affected zone (HAZ) can get sensitized and this may subsequently lead to stress corrosion cracking. Bhaumik et al. [10] discussed the premature failure of a primary reformer tube in an ammonia plant in which number of catalyst

    Get a quote
  • GAS COOLING SYSTEMS FOR STEAM REFORMING …

    2018-4-16 · integration of steam reforming processes and waste heat recovery. 1 SCHMIDTSCHE SCHACK . Page 4 2.1 WASTE HEAT RECOVERY IN DOWN- processes a boiler feed water economizer or even a process condensate preheater is catalyst tubes and the secondary reformer enters the process gas cooler where

    Get a quote
  • Problem, Failure and Safety Analysis of Ammonia Plant: a

    2011-1-17 · Reformer tube can also fail by stress corrosion cracking. During welding, the steel in the heat affected zone (HAZ) can get sensitized and this may subsequently lead to stress corrosion cracking. Bhaumik et al. [10] discussed the premature failure of a primary reformer tube in an ammonia plant in which number of catalyst

    Get a quote
  • Indian J. Fert., Vol. 8 (8), pp. 16-22 pages (7 pages

    2015-9-10 · reformed gas waste heat boiler. Tube leakage in waste heat boiler was the most common problem faced by almost all the nine plants. Hot spot on secondary reformer top dome air inlet nozzle and manhole cover and leakage in BFW control valve flange were other reasons for higher downtime in secondary reformer section.

    Get a quote
  • Waste Heat Boiler Erection Job()_

    2011-6-21 · Waste Heat Boiler Erection Job()_/__ 1334 Waste Heat Boiler Erection Job(

    Get a quote
  • Failure of the transfer line in ammonia Plant and …

    2006-8-15 · Krishak Bharati Cooperative Limited is a large Nitrogenous Fertiliser Complex situated in Western India. This plant is in operation since 1985. In the year 1999 after few days of plant start-up, one of the transfer lines connected between secondary reformer and waste heat boiler had a failure.

    Get a quote
  • Secondary Reformer Refractory Dry Out Operation – …

    Secondary reformer and waste heat boiler tube sheet checked after removal of bricks wall found ok and Hammer test was ok, small yellowish marks observed on tube side casting. No cracks were observed. At one point on top side of discharge end some sound difference (hollow sound) was noticed, overall report of dry out found ok and these test was